HCC is designing an new SET building. The latest meeting was Jan 2013. We were shown what is probably the final floor plan. We were shown different 3D views of the rooms which were really exciting. We were told that building (according to current plans) would start Jan. 2014 and finish Jan. 2016. This page will be updated when there is more news.

This graphic is looking in the high bay from the back garage roll up type door that connects to a driveway. The eight moveable desks can be seen along with the door entrance from the lobby. The second floor cat-walk also has a door to the lobby. Here is a pdf of the new building that displays 2D and 3D views of all the new engineering rooms.

high bay room of the new SET building engineering rooms